Tracked shipping to Taiwan with premium packaging for just NT$300 

Ship to
Taiwan
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Select your country

Americas

Europe

Rest of the world

portada Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 With Destructi
Type
Physical Book
Publisher
Language
English
Pages
138
Format
Paperback
Dimensions
28.0 x 21.6 x 0.8 cm
Weight
0.34 kg.
ISBN13
9781499623109

Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 With Destructi

Commission, U. S. Nuclear Regulatory (Author) · Createspace · Paperback

Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 With Destructi - Commission, U. S. Nuclear Regulatory

New Book Imported to Taiwan
Delivery: 03 Aug - 14 Aug Shipping: 16 to 20 business days.
NT$ 1,014
NT$ 1,014

Synopsis "Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 With Destructi"

Research is being conducted for the U.S. Nuclear Regulatory Commission (NRC) at the Pacific Northwest National Laboratory (PNNL) to assess the effectiveness and reliability of advanced nondestructive examination (NDE) methods for the detection and characterization of flaws in nuclear power plant components. One area of concern relates to the nickel-based alloys used in primary pressure boundary components in pressurized water reactors (PWRs). Nickel-based alloys exposed to reactor coolant in PWRs may experience a form of degradation known as primary water stress corrosion cracking (PWSCC). One PWR component that has an operational history of PWSCC is the control rod drive mechanism (CRDM) nozzle. The CRDM nozzles are cylindrical penetrations in the upper reactor pressure vessel (RPV) head that allow for the insertion and removal of control rods. The penetration tube is held in place with an interference fit, and is seal-welded on the underside of the vessel head with a J-groove weld. Cracking in the nozzle or weld metal can allow borated water to leak to the top of the RPV head. Boric acid corrosion of the RPV head, as occurred at Davis Besse, is a concern, as is nozzle ejection in the presence of extensive circumferentially oriented cracking. In response to a number of observations of RPV head leakage at domestic plants, NRC regulations were modified to require PWR licensees to periodically perform a demonstrated surface or volumetric leak path assessment of all J-groove welds in the RPV head.

Customers reviews

Frequently Asked Questions about the Book

All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.

Questions and Answers about the Book

Do you have a question about the book? Login to be able to add your own question.

Opinions about Bookdelivery

More customer reviews